Water Bath With Magnetic Stirrer Digital Display Thermostatic Heat Collection Magnetic Stirrer Laboratory WBS-6Pro ,Adjustable Stirring Speed

★★★★★ 4.4 147 reviews

US$115.20
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.nudge-creator.fr
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$115.20
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Nov 13
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.nudge-creator.fr
Free 30-day returns Details

Product details

Management number 238147137 Release Date 2026/07/11 List Price US$115.20 Model Number 238147137
Category

<p>Model:WB-6S/WBS-6pro</p><p>Stirring speed:100-1200 RPM for model WBS-6pro</p><p>Motor type:Brushless Motor</p><p>Increment:50 RPM</p><p>Liner size:200 X 200 X 130mm(depth)-2L flask or 3L beaker</p><p>Product size:260 X 265 X 325mm</p><p>Temperature range:Room temperature +5°C - 100°C</p><p>Display Accuracy:0.1</p><p>Temperature stability:±1</p><p>Control mode:Digital control panel + Key</p><p>Timing:1min - 23h59min</p><p>Related Products:paint mixer,vortex mixer,paint shaker,nail polish shaker,ink mixer tattoo,vortex,mini vortex mixer,nail polish mixer,centrifuge machine,nail painting machine,shake mixer</p>

  • Sturdy vortex mixer with reliable running performance. Simple to operate and place, suitable for various laboratory mixing applications.
  • Intelligent control adjustable temperature and timing: the temperature can be set freely, and the timing function can be set to make the experiment convenient and easy
  • Anti-dry burning and safer: considerate protection measures to prevent damage caused by low water level and improve experimental safety
  • 360° circulation heating: built-in stainless steel conductive tube, one-piece stainless steel liner can adjust the lid to lock the temperature and realize constant temperature experiment
  • One-piece stainless steel liner: high temperature resistant, corrosion resistant, no rust, safe experiment.
  • After-sales service: If there is any problem with our product, please contact us in time, we will reply you within 24 hours.
Maximum speed 1200 rpm
Volume capacity 2 L
Brand Momo
Minimum speed 100 rpm
Dimensions 260.00 x 265.00 x 325.00 Millimeters
Weight 74.13 oz
Has written warranty No
Model WBS-6pro

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.4 out of 5
★★★★★
147 ratings | 60 reviews
How item rating is calculated
View all reviews
5 stars
81% (119)
4 stars
5% (7)
3 stars
2% (3)
2 stars
1% (1)
1 star
11% (16)
Sort by

There are currently no written reviews for this product.